MUSTAFA ARSLAN ÖRNEK - PDF

Description
MUSTAFA ARSLAN ÖRNEK OFFICE Faculty of Engineering and Computer Sciences Department of Industrial Engineering Izmir University of Economics Sakarya Cad. No. 156, Balcova Izmir, Turkey Room No. 314

Please download to get full document.

View again

of 8
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Information
Category:

Poems

Publish on:

Views: 19 | Pages: 8

Extension: PDF | Download: 0

Share
Transcript
MUSTAFA ARSLAN ÖRNEK OFFICE Faculty of Engineering and Computer Sciences Department of Industrial Engineering Izmir University of Economics Sakarya Cad. No. 156, Balcova Izmir, Turkey Room No. 314 Tel: (232) Fax: (232) arslan.ornek at ieu.edu.tr EDUCATION Ph.D. 1980, University of Wales Institute of Science and Technology UWIST (renamed as Cardiff University), Cardiff, U.K., Dept. of Mechanical Engineering and Engineering Production (MEEP) M.Sc. 1977, Middle East Technical University (METU), Ankara, Turkey, Industrial Engineering Dept. B.Sc. 1974, Middle East Technical University (METU), Ankara, Turkey, Industrial Engineering Dept. EDUCATIONAL POSITIONS Teaching Assistant, Middle East Technical University Part-time lecturer, Izmir Institute of Technology (IYTE) Asst. Prof., Izmir Institute of Technology, Dept. of Mechanical Engineering Asst. Prof., Dokuz Eylul University (DEU), Dept. of Industrial Engineering Asst. Prof., Izmir University of Economics, Industrial Systems Eng. Dept present Assoc. Prof., Izmir University of Economics, Industrial Engineering Dept. MANAGERIAL EXPERIENCE Asst. Coordinator, Project Planning and Investments, Yasar Holding Dept. Manager, Planning and Info Systems, DYO Paint Factories Asst. General Manager, Yasar Int. Textiles Managing Partner, Politeks Ltd Consultant to the President, Izmir Institute of Technology (IYTE) Director, Center of Continuing Education, IYTE Head of Foreign Languages Department, IYTE Director, Engineering Management Graduate Program, IYTE Vice Chair, Dokuz Eylul University, Dept. of Industrial Engineering Vice Director, Graduate School of Natural and Applied Sciences, DEU 2008 present Board member, Faculty of Eng. and Comp. Sciences, Izmir Uni. of Economics 2009 present Head of Industrial Eng. Dept., Izmir University of Economics SCHOLARSHIPS Kennedy Memorial Fund TUBITAK MSc fund TUBITAK - NATO PhD fund RESEARCH AREAS Advanced Planning Systems (APS) Scheduling and Constraint Programming Lot streaming Finite capacity planning and lot sizing Assembly line balancing Stability of production planning systems Referee and Reviewer for International Journal of Production Research Journal of Applied Mathematics and Decision Sciences Computers & Industrial Engineering International Journal of Advanced Manufacturing Technology European Journal of Operational Research Simulation Modelling Theory and Practice Production Planning and Control TEACHING Izmir University of Economics (Dept. of Industrial Systems Eng.) 2007 ISE 203 Optimization I Linear models ISE 204 Optimization II Non-linear models ISE 324 Fundamentals of Modern Manufacturing Systems ISE 480 Sequencing and Scheduling ISE 320 Supply Chain Management ISE 360 Production and Service Systems Management MATH 224 Statistics II MATH 218 Probability and Random Processes ISE 420 Algorithmic Operations Research ISE 313 Computer Integrated Manufacturing and Automation ISE 314 Advanced Manufacturing Systems ISE 201 Systems Design and Analysis ISE470 Facilities Design and Planning Dokuz Eylul University (Industrial Engineering Dept.) IND 522 Advanced Engineering Management IND 451 Production Planning IND 517 Dynamic and Stochastic Programming IND 601 Estimation Procedures IND 606 Fundamentals of Optimization IND 531 Lean Production Systems END 328 Production Management II IND 504 Inventory Systems Analysis Izmir Institute of Technology (Dept. of Mechanical Eng.) ECON 205 Principles of Economics ME 328 Manufacturing Engineering ME 401 Engineering Economics and Design CENG 432 Management Information Systems (Computer Eng) ME 584 Manufacturing Planning and Control EM 507 Financial Analysis and Engineering Economics (Engineering Management) GRADUATE THESES SUPERVISED a. Master Theses 1. A Mathematical Modeling Approach to Energy Cost Saving in a Manufacturing Plant, Esra Uzel,(2004), IYTE Mechanical Engineering 2. Heuristic Approaches to Scheduling Problems in a Flexible Job Shop Environment, Emin Ö. İliş, 2004, IYTE Mechanical Engineering 3. A decomposition method for a resource constrained parallel machine scheduling problem, Emrah Edis, 2004, DEU Industrial Engineering 4. Finite capacity planning problem with lot sizing decisions in an MRP environment, Özgür Cengiz, 2004, DEU Industrial Engineering 5. Measurement of instability in multi item MRP systems under varying operating conditions, Kamil Erkan Kabak, 2005, DEU Industrial Engineering 6. Vehicle scheduling with sequence dependent trips, Sadık Serhat Karakütük, 2006, DEU Industrial Engineering 7. Finite capacity planning in MRP systems: problems and issues, Cemalettin Öztürk, 2007, DEU Industrial Engineering 8. Rescheduling manufacturing systems, Serkan O. Dibek, 2011, IEU Intelligent Production Systems (in progress) b. Ph.D Dissertations 1. Multi Product Economic Lot Sizing and Scheduling Problems in Flow Shops, Rahime S. Edis, 2009, DEU Industrial Engineering PROJECTS 1. Pınar Diary integrated meat products feasibility project ( ) 2. Altın Yunus holiday inn systems analysis project (1983) 3. Yasar Bilgi Islem, Education and Training project (certified by the Ministry of Education) (1984) 4. MRPII (Manufacturing Resources Planning) project leader, DYO Paint Factories ( ) 5. EGEMAS Project (TTGV) ( ) 6. HAOS Hyundai TUBITAK-TEYDEB Project (2008) 7. BIMAR Container allocation TUBITAK-TEYDEB Project ( ) 8. EGEBIMTES Scheduling TUBITAK-TEYDEB Project ( ) PUBLICATIONS International Refereed Journals 1. Collier, Peter I. and Örnek, Arslan M., A mathematical model for energy and in-process inventory assesment in a manufacturing system, Applied Energy, Vol. 13, No. 14, pp , (1983) 2. Örnek, Arslan M. and Collier, Peter I., The determination of in-process inventory and manufacturing lead time in multi-stage production Systems, International Journal of Operations and Production Management, Vol. 8, No. 1, pp 74-80, (1988) 3. Örnek, Arslan M. and Cengiz, Özgür., Capacitated lot sizing with alternative routings and overtime decisions, International Journal of Production Research, Vol. 44, No. 24, pp , (2006) 4. Kabak, K. Erkan and Örnek, Arslan M., An improved metric for measuring multi-item multi-level schedule instability under rolling schedules, Computers and Industrial Engineering, Vol. 56, No. 2, pp , (2009) 5. Ekinci, Esra and Örnek, Arslan M., A heuristic approach for determining lot-sizes and schedules using power-of-two policy, Journal of Applied Mathematics and Decision Sciences, Volume 2007, doi /2007/53606, (2007) 6. Ekren, Banu Y. and Örnek, Arslan M., A simulation based experimental design to analyze factors affecting production flow time, Simulation Modelling Practice and Theory, Vol. 16, No. 3, pp , (2008) 7. Eliiyi, Deniz T., Örnek, Arslan M. and Karakutuk, S. S., A vehicle scheduling problem with fixed trips and time limitations, International Journal of Production Economics, Vol. 117, No. 1, pp , (2009) 8. Edis, Rahime S. and Örnek, Arslan M., A tabu search based heuristic for single product lot streaming problems in flow shops, International Journal of Advanced Manufacturing Technology (accepted for publication, online since ), doi: /s Edis, Rahime S. and Örnek, Arslan M., Simulation analysis of lot streaming in job shops with transportation queue disciplines, Simulation Modelling Practice and Theory, Vol. 17, No. 2, pp , (2009) 10. Örnek, Arslan M., Özpeynirci, S., and Öztürk, C., A Note on A Mixed Integer Programming Model for Advanced Planning and Scheduling, European Journal of Operations Research, Vol. 203, Issue 3, pp , (2010) 11. Ozturk, C. and Örnek, Arslan M., Capacitated lot sizing with linked lots for general product structures in job shops, Computers and Industrial Engineering, Vol. 58, No. 1, (2010) 12. Ozturk, C., Semra T., Hnich, B. and Ornek, Arslan M., Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times, Electronic Notes in Discrete Mathematics, Vol 36, 1, Pages 65-72, (2010) 13. Ozturk, C. and Ornek, Arslan M., A MIP Based Heuristic for Capacitated MRP Systems, Computers and Industrial Engineering, Vol 63, 4, pages , (2012) 14. Ozturk, C.; Tunali, S.; Hnich, B.; Ornek, Arslan M., Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Parallel Stations, Int. J. Adv. Tech. (accepted for publication), DOI /s , (2012) 15. Ozturk, C.; Tunali, S.; Hnich, B.; Ornek, Arslan M., Balancing and Scheduling of Flexible Mixed Model Assembly Lines, Constraints, Vol 18, pages , (2013) Chapters in Books 1.Gokce, Mahmut Ali, M. Cemali Dincer, and Arslan M. Ornek, Analysis of Transient Throughput Rates of Transfer Lines with Pull Systems, in Just-in-Time Systems, Y.A. Ríos- Solís and R.Z. Ríos-Mercado (Eds.), Springer Series on Optimization and Its Applications, Vol. 60, P.M. Pardalos and Ding-Zhu Du (Series eds.), due December 28, 2011, ISBN Papers Submitted to International Refereed Journals 1. Ozturk, C. and Ornek, Arslan M., Optimisation and Constraint based Expert Systems for Advanced Planning and Scheduling , Expert Systems with Applications, (under review), (2013) 2. Ozturk, C. and Ornek, Arslan M., Operational Extended Model Formulations for Advanced Planning and Scheduling Systems , Applied Mathematical Modelling, (under revision), (2012) Proceedings and Scientific Presentations 1. Örnek, Arslan M., Energy management modeling for production, Vth Int. Conf. on Production Research, Amsterdam, The Netherlands, (1979) 2. Örnek, Arslan M. and Esra Ekinci, Multi-Item inventory replenishments with partial backordering under investment constraint, Euro/INFORMS Joint International Meeting, Istanbul, Turkiye, (2003) 3. Ekinci, Esra and Arslan M. Örnek, Determination of optimal lot-sizes using power-of-two policy under technology dependent constraints, Euro/INFORMS Joint International Meeting, Istanbul, Turkiye, (2003) 4. Örnek, Arslan M. and Esra Ekinci, Energy appraisal in manufacture, First Int. Symp. on Exergy, Energy and Environment, Izmir, Turkiye, (2003) 5. Kabak, Erkan and Arslan M. Örnek, Measurement of instability in multi-item MRP systems under varying operating conditions, 35th Int. Conf. on Computers & Industrial Eng., Istanbul, Turkiye, (2005) 6. Edis, Rahime S. and Arslan M. Örnek, A simulation based heuristic algorithm for a lot streaming problem in a flow shop, AMSE2006 International Conference on Modelling and Simulation, Selcuk University, Konya, Turkiye, (2006) 7. Ekren, Banu Y., Demir, L. and Arslan M. Örnek, A simulation based experimental design to identify factors for facility design, AMSE2006 International Conference on Modelling and Simulation, Selcuk University, Konya, Turkiye, (2006) 8. Kabak, Erkan K., Arslan M. Örnek, and Cathal Heavey, An improved metric for measuring schedule instability in MRP environment, IMC23 23rd Int. Manufacturing Conference, Uni. of Ulster, Ireland, (2006) 9. Sancar, Rahime E. and Arslan M. Örnek, A neighboorhood search algorithm for a lot streaming problem in a flow shop, 5th IFAC-DECOM TT Workshop, Izmir, Turkiye, (2007) 10. Sancar, Rahime E. and Arslan M. Örnek, The effects of transportation activities for lot streaming problems in stochastic job shops, IFAC-CEFIS Symposium, Dogus University, Istanbul, Turkiye, (2007) 11. Öztürk, Cemalettin, Semra Tunalı and Arslan M. Örnek, Simultaneous balancing and scheduling of mixed model assembly lines with task sequencing and general precedence diagram, 23rd European Conference on Operational Research Bonn, (2009) 12. Muhafız, M., Arslan M. Örnek, Özpeynirci, S., Öztürk, C., Oktay, Ö., and Dumanlı, U., Dynamic lead time management, 23rd European Conference on Operational Research, Bonn, (2009) 13. Öztürk, C., S. Tunalı, B. Hnich and Arslan M. Örnek, Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times, International Symposium on Combinatorial Optimization, Hammamet, Tunisia, (2010) 14. Sancar, R. E. and Arslan M. Örnek, A Solution Approach for Multi Product, Multi Stage Lot Streaming Problems in Flow Shops with Consistent Sublots, 1st International Symposium on Computing in Science & Engineering (ISCSE), Gediz University, Izmir, Turkiye, (2010) 15. Örnek Arslan M., Deniz Türsel Eliiyi, Zeynep Sargut and Cemalettin Öztürk, Assignment of transit container bookings for a transit agency, 24th Mini EURO Conference EUROPT 2010, Izmir University of Economics, Izmir, Turkiye, (2010) 16. Ozturk, C., Tunali, S., Hnich, B., Arslan M. Örnek, Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence dependent task time increments, 24th Mini EURO Conference EUROPT 2010, Izmir University of Economics, Izmir, Turkiye, (2010) 17. Ozturk, C., Kabak, E. K., Arslan M. Örnek, and Heavey, C., Improved Solution of Capacity Allocation Problem for Photolithography Area (CAPPA) in Semiconductor Manufacturing, IMC28 28th Int. Manufacturing Conference, Dublin City University, Ireland, (2011) 18. Ozturk, C.; Tunali, S.; Hnich, B.; Ornek, Arslan M., A Constraint Programming Model for Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Parallel Stations, INCOM 2012, 14 th IFAC Symposium, Bucharest, Romania, May Ozturk, C.; Ornek, Arslan M., A Constraint Based Heuristic To Solve Advanced Planning and Scheduling Problems, ECCO 2012, 25 th Conference of European Chapter on Combinatorial Optimization, Antalya, Turkiye, April National Refereed Journals 1. Örnek, Arslan M., MRPII sistemlerinin kurulmasında karşılaşılan sorunlar ve uygulamaya koyma, Endüstri Mühendisliği, Yıl 1, Sayı 3, (1989) 2. Edis, Rahime S., Örnek, Arslan M. and Eliiyi, Deniz T., A review on lot streaming problems with transportation activities, Istanbul Ticaret Universitesi Fen Bilimleri Dergisi, Yıl 6, Sayı 11, Bahar 2007/1, s , (2007) Proceedings and Scientific Presentations in National Meetings 1. Örnek, Arslan M. ve Savaş Özatalay, Yatırım kısıtlamalı bir stok kontrol modelinin çözümü, YA/EM III. Ulusal Kongresi, Ege Universitesi, Izmir, (1977) 2. Örnek, Arslan M., Çok Aşamalı Üretim Sistemlerinde Enerji ve Ara Stokların Değerlendirilmesi için bir Matematiksel Model, YA/EM VIII. Ulusal Kongresi, ODTÜ, Ankara, (1983) 3. Örnek, Arslan M., (1984), Çok Aşamalı Üretim Sistemlerinde Üretim Süresi ve Ara Stokların hesaplanması, YA/EM IX. Ulusal Kongresi, Istanbul, (1984) 4. Örnek, Arslan M., MRPII Sistemlerinin Uygulamaya Konmasında Karşılaşılan Sorunlar ve Uygulamaya Koyma, YA/EM XII. Ulusal Kongresi, Bilkent Universitesi, Ankara, (1989) 5. Kabak, Erkan K. and Arslan M. Örnek, A Review of Instability of Planning Systems in a Material Requirements Planning Environment, YA/EM XXIV. Ulusal Kongresi, Çukurova Universitesi, Adana, (2004) 6. Karakutuk, Sadık S., Eliiyi, Deniz T. and Arslan M. Örnek, Gercek bir arac cizelgeleme problemi, UNIVERSIADE 2005, YA/EM XXV. Ulusal Kongresi, Koc Universitesi, Istanbul, (2005) 7. Cengiz, Özgur and Arslan M. Örnek, Capacitated lot sizing with alternative routings and overtime decisions, YA/EM XXV. Ulusal Kongresi, Koc Universitesi, Istanbul, (2005) 8. Öztürk, Cemalettin and Arslan M. Örnek, Finite capacity lot sizing with lead time windows, YA/EM XXVI, Ulusal Kongresi, Kocaeli Universitesi, Kocaeli, (2006) 9. Ekren, Banu Y., Arslan M. Örnek and Deniz T. Eliiyi, Facility layout problems: Emerging trends, solution procedures and research challenges, YA/EM XXVI. Ulusal Kongresi, Kocaeli Universitesi, Kocaeli, (2006) 10. Edis, Rahime S. and Arslan M. Örnek, A review on lot streaming problems with transportation activities, YA/EM XXVI. Ulusal Kongresi, Kocaeli Universitesi, Kocaeli, (2006) 11. Edis, Rahime S. and Arslan M. Örnek, The effects of transporter queue disciplines in lot streaming problems, YA/EM XXVII. Ulusal Kongresi, Dokuz Eylul Universitesi, Izmir, (2007) 12. Heragu, Sunderesh, Banu Y. Ekren and Arslan M. Örnek, Analysis of Manufacturing Systems via semiopen queueing networks (SOQN), YA/EM XXVII. Ulusal Kongresi, Dokuz Eylul Universitesi, Izmir, (2007) 13. Öztürk, Cemalettin and Arslan M. Örnek, Considerations on multi level, multi resource lot sizing and scheduling models, YA/EM XXVII. Ulusal Kongresi, Dokuz Eylul Universitesi, Izmir, (2007) 14. Öztürk, Cemalettin, Semra Tunalı and Arslan M. Örnek, Sıra Bağımlı Montaj Hattı Dengeleme Problemi için Bir Kısıt Programlama Modeli, YA/EM XXVIII. Ulusal Kongresi, Galatasaray Universitesi, Istanbul, (2008) 15. Öztürk, Cemalettin, Semra Tunalı and Arslan M. Örnek, Karisik Modelli Esnek Montaj Hatlarinin Tasarimi ve Cizelgelenmesi, YA/EM 29. Ulusal Kongresi, BilkentUniversitesi, Ankara, (2009) 16. Edis, Rahime S. and Arslan M. Örnek, Çok Ürünlü Kafile Bölme ve Kaydırma Problemlerinde Sıralama Algoritmalarının Basarımlarının Değerlendirilmesi, YA/EM 29. Ulusal Kongresi, BilkentUniversitesi, Ankara, (2009) 17. Edis, Rahime S. and Arslan M. Örnek, Çok Ürünlü Kafile Bölme ve Kaydırma Problemlerinde Sıralama Algoritmalarının Basarımlarının Değerlendirilmesi, YA/EM XXIX. Ulusal Kongresi, Bilkent Universitesi, Ankara, (2009) 18. Edis, Rahime S. and Arslan M. Örnek, Akış tipi sistemlerde, çok ürünlü, değişken alt kafileli kafile bölme ve kaydırma problemlerine tabu arama tabanlı melez bir yaklaşım, YA/EM XXX. Ulusal Kongresi, Sabancı Universitesi, İstanbul, (2010) Other Publications and Conference Presentations 1. Örnek, Arslan M., A general Literature Survey on Energy and Energy System Modeling, MEEP Tech. Note, UWIST, Cardiff, U.K., Örnek, Arslan M., Energy and its Effect on Production Management Thinking, MEEP Tech. Note, UWIST, Cardiff, U.K., 1980
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks